单词 Critical path algorithm
释义

Critical path algorithm

英语百科

Critical path method

PERT chart for a project with five milestones (10 through 50) and six activities (A through F). The project has two critical paths: activities B and C, or A, D, and F – giving a minimum project time of 7 months with fast tracking. Activity E is sub-critical, and has a float of 1 month.
Activity-on-node diagram showing critical path schedule, along with total float and critical path drag computations

The critical path method (CPM) is an algorithm for scheduling a set of project activities.