The answer was a simple system called " cut and cover."
问题的答案很简单,那就是:随挖随填技术。
每日英语听力 | 双语精读
These new lines, called tubes, were at varying depths, but usually about 25 meters deeper than the " cut and cover" lines.
这些新建的地铁线叫做地铁,它们的深度不同,但通常比随挖随填的隧道深 25 米。
每日英语听力 | 双语精读
By the late 1880s, the city had become too dense with buildings, sewers, and electric cables for the " cut and cover" technique, so a new system had to be devised.